Detail specification
High-Tg Substrate
FR-4 with Tg ≥170°C (DSC), Z-axis CTE ≤50 ppm/°C; withstands 260°C lead-free reflow multiple times.
Preventing board warpage and delamination under high power and thermal cycling.
Most Challenging: Drilling high-Tg materials (brittle, prone to burrs) and controlling resin flow during lamination.
Conformal Coating
Polyurethane (UR) or silicone (SR), 50–80 μm thickness; passes salt fog (5% NaCl, 48 h), condensation,
and 85°C/85% RH for 168 h.
Outdoor corrosion and moisture protection – essential for field durability.
Selective coating of connectors, test points, and heatsinks; achieving uniform thickness and adhesion, plus rework difficulty.
Solder Joint & Mechanical Robustness
Power component shear force ≥15 kgf; BGA voiding <15%; passes 2g vibration (5–500 Hz) and 30g mechanical shock.
Withstanding road-induced vibrations and thermal-mechanical stress.
Balancing large thermal-mass joints with small BGA voids – requires tight reflow control and X-ray screening.
EV charger Application Scenarios
By Operation Mode:
Public Charging:Open-access charging facilities deployed at highways, shopping malls and logistics parks for all general EVs.
Dedicated Charging:Special-purpose charging infrastructure built exclusively for specific vehicle fleets such as buses and taxis.
Private Charging:Low-speed overnight charging solutions installed at homes or workplaces for personal-use electric vehicles.
By Charging Technology:
AC Charging:Medium-slow power charging option with longer charging cycles, ideal for households and shopping-mall scenarios.
DC Fast Charging:High-power rapid charging technology designed for highways and long-distance travel to shorten charging time.
By Installation Environment:
Indoor Charging:Charging equipment placed in garages and underground parking lots with fundamental environmental
protection measures.
Outdoor Charging:Charging piles set up in open-air public parking lots and streets, complying with strict
weather-resistance standards.
By Business Model:
Destination Charging:Charging services offered at end-user venues including hotels, fitness centers and tourist attractions.
V2G & Energy Services:Vehicle-to-grid bidirectional energy interaction that supports grid peak-shaving and
other energy-related applications.
Battery Swapping:Quick-turnaround service that realizes fast energy replenishment through direct battery replacement.

EV charger PCBA Production Line

Our Business Model
1.We can offer you professional manufacture:
a.) OEM PCBA for your EV-charger: PCB+Components+Assembly
b.) OEM(PCB+components+assembly+case) for your whole EV-Charger: PCB+Components+Assembly+Housing/Case mold
2.If you don’t have mature design,we have strong external resources:
We have long-term cooperative professional EV charger design companies with rich experience to customize your products:
a.) ODM for your whole EV-Charger: Design+PCB+Components+Assembly+Housing/Case mold
b.) EMS for your whole EV-Charger:PCBA+Housing/Case mold+Assembly+Function test+Packing
Contact us
Contact us for any help regarding EV charger PCBA
Website: www.xdpcba.com
Email: sales@xdpcba.com;sales4@xdpcba.com